ποΈFencing in Fort Myers
Quick answer
The City of Fort Myers Building, Permitting and Inspections division issues building permits from 1825 Hendry Street. Fort Myers counts flood-zone improvements over a 12-month period under its 50% rule, and work in its four historic districts needs a Certificate of Review.
Fort Myers checks lien paperwork closely, counts flood-zone work over a year, and reviews exterior changes in four historic districts. Here is what each means for a homeowner.
Who issues building permits
The City of Fort Myers Building, Permitting and Inspections division issues permits from 1825 Hendry Street, Suite 101 (239-321-7925, [email protected]). Its trade checklists, such as the plumbing and irrigation checklist, require "Current Contractor Registration with The City of Fort Myers" at issuance, and proof of ownership if the owner on the Lee County Property Appraiser site differs from the application. Applications can be signed by the license holder or by an owner-builder, who also files an Owner-Builder Disclosure Statement.
Check a contractor's state license on the DBPR license search, and read our licensing guide.
Notice of Commencement
State law has the owner record a Notice of Commencement before work starts on an improvement over $2,500 (s. 713.13, s. 713.02(5), F.S.). The city's NOC requirements guide says that under s. 713.135, a notice is required before scheduling inspections "for each permit where the job valuation exceeds $5,000.00 or $15,000.00 in the case of HVAC change out(s)." The guide also says:
- The address, parcel number or legal description must match the Lee County Property Appraiser.
- The description of improvements and the contractor must be consistent with the permit application.
- The notice must be recorded and certified through the Lee County Clerk of Courts.
- If the permit hasn't been issued, the notice becomes void 90 days after recording.
Mismatched details are an easy way to lose a week, so compare the notice against the permit before you record it.
Flood zones and the 12-month rule
The city's FEMA Community Rating System page defines substantial improvement as any combination of repairs or improvements "taking place during a 12-month period, the cumulative cost of which equals or exceeds 50 percent of the market value of the building." The 12-month clock starts with the first improvement or repair. The city's substantial improvement packet notes that if the lowest floor, including electrical and mechanical equipment and the bathroom, is already above base flood elevation, the building can be repaired without having to comply with the 50 percent rule.
Historic districts
Fort Myers "has four historic districts, named the Downtown District, Edison Park, Dean Park and Seminole Park," along with locally designated landmarks, according to the city's Certificate of Review instructions. The city's historic preservation ordinance says a Certificate of Review must be approved before any alteration, new construction, relocation or demolition there. Historic Preservation Commission hearings in 2026 reviewed jobs as routine as a new metal roof and new windows in the Dean Park district, according to the commission's March 2026 agenda and June 2026 minutes.
Weather
NOAA's 1991-2020 normals for Fort Myers Page Field show 57.41 inches of rain a year and about 120 days at 90Β°F or hotter.
Find contractors in Fort Myers
Browse Fort Myers plumbers, electricians, AC contractors, roofers, remodelers, landscapers in Fort Myers, painters, concrete contractors, window and door installers and gutter cleaning services. See Florida gutter cleaning costs and HVAC costs, use the hiring checklist, and get quotes.
Sources
- City of Fort Myers: Plumbing and Irrigation Trade Checklist (PDF)
- City of Fort Myers: Notice of Commencement Requirements (PDF)
- City of Fort Myers: FEMA Community Rating System
- City of Fort Myers: FEMA Substantial Improvement Packet (PDF)
- City of Fort Myers: Certificate of Review Instructions (PDF)
- City of Fort Myers: Historic Preservation Ordinance (PDF)
- Florida Statutes s. 713.13, s. 713.02, s. 713.135
- NOAA NCEI 1991-2020 normals: Fort Myers Page Field
- Florida DBPR license search
Frequently asked questions
Who issues building permits in Fort Myers?
The City of Fort Myers Building, Permitting and Inspections division, at 1825 Hendry Street, Suite 101 (239-321-7925, [email protected]). Its trade checklists require a current contractor registration with the city at permit issuance.
How does Fort Myers apply the 50% rule?
The city defines substantial improvement as any combination of repairs or improvements taking place during a 12-month period whose cumulative cost equals or exceeds 50 percent of the building's market value before the work started. The 12-month period begins with the first improvement or repair.
What does Fort Myers check on a Notice of Commencement?
The city says the address, parcel number or legal description must match the Lee County Property Appraiser, the description of work and the contractor must match the permit application, and the notice must be recorded and certified through the Lee County Clerk of Courts. It is required before inspections on permits over $5,000, or over $15,000 for an HVAC change-out.
Which Fort Myers neighborhoods are historic districts?
The city has four historic districts: Downtown, Edison Park, Dean Park and Seminole Park, plus locally designated landmarks. Alterations, new construction, relocation and demolition there need a Certificate of Review from the Historic Preservation Commission or its staff.