Contractors in Palm Bay, Florida
Brevard County • Population: 148,092
Showing 34 verified contractors
ποΈFencing in Palm Bay
π§±Concrete in Palm Bay
πͺWindows & Doors in Palm Bay
π¦Gutter Cleaning in Palm Bay
Quick answer
The City of Palm Bay Building Department issues building permits from 110 Malabar Road SE, and every document goes in electronically through the IMS portal. City checklists require a Notice of Commencement on jobs over $5,000 and a signed Product Approval Affirmation for remodels.
Palm Bay's Building Department runs every permit through one online portal, and its checklists spell out exactly what each job type needs. Here is what applies to a typical home project.
Who issues building permits
The City of Palm Bay Building Department, 110 Malabar Road SE (321-953-8924, [email protected]), issues permits. The city's permit checklists, such as the remodel requirements, say "all documents are required to be electronically submitted through the IMS portal," where the online application has to be filled in completely.
For a remodel, that checklist lists:
- A signed Product Approval Affirmation
- Subcontractor permit authorization forms, if not already on file for the year
- An owner/builder affidavit, if you are applying as your own contractor
- Proof of ownership, such as a warranty deed
- A Notice of Commencement for work over $5,000
Some projects also need a separate Public Works permit on file before the building permit issues, according to the city's addition requirements (Public Works: 321-952-3403). The city's code compliance page lists structural repairs, new fencing, most plumbing, electrical and mechanical work, roof jobs and driveway additions among work that may need permits.
Check your contractor's state license on the DBPR license search, and read our licensing guide.
Product approvals
Palm Bay's window requirements ask for product approval or a product approval affidavit, plus energy documentation for the U-factor and SHGC of the glass. Ask your installer for those numbers in writing with the bid. They let you check a product's Florida approval in the state's product approval search.
Notice of Commencement
State law has the owner record a Notice of Commencement before work starts on any improvement over $2,500 (s. 713.13, s. 713.02(5), F.S.). The Building Department's checklists ask for a copy for work over $5,000, matching the threshold at which s. 713.135(1)(e) has permit offices collect one before the first inspection. Record it with the Brevard County Clerk of Court.
Trees and land clearing
The city's code compliance page says "a permit for removal of trees on commercial and residential parcels over one (1) acre is also required." The city's tree protection summary adds that site work permits are required for residential lots of an acre or more, and that on single-family lots under an acre, an approved building permit is required before clearing. If you are building on a vacant lot, don't let anyone clear it until the right permit is issued.
Weather
NOAA's 1991-2020 normals for Melbourne International Airport show 50.79 inches of rain a year and about 63 days at 90Β°F or hotter.
Find contractors in Palm Bay
Browse Palm Bay plumbers, electricians, AC contractors, roofers, remodelers in Palm Bay and landscapers. Check Florida roofing costs and plumbing costs, run through the hiring checklist, and get quotes.
Sources
- City of Palm Bay: Remodel Permit Requirements (PDF)
- City of Palm Bay: Addition Permit Requirements (PDF)
- City of Palm Bay: Window Requirements (PDF)
- City of Palm Bay: Top Violation Complaints
- City of Palm Bay: Tree Protection, Chapter 175 summary (PDF)
- Brevard County Clerk of Court
- Florida Building Commission: Product Approval search
- Florida Statutes s. 713.13, s. 713.02, s. 713.135
- NOAA NCEI 1991-2020 normals: Melbourne International Airport
- Florida DBPR license search
Frequently asked questions
Who issues building permits in Palm Bay?
The City of Palm Bay Building Department, 110 Malabar Road SE (321-953-8924, [email protected]). The city says all documents must be submitted electronically through its IMS portal.
What does a remodel permit need in Palm Bay?
The city's remodel checklist lists a signed Product Approval Affirmation, subcontractor permit authorization forms if not on file, an owner/builder affidavit if the owner is acting as contractor, proof of ownership, and a Notice of Commencement for work over $5,000.
Do I need a permit to remove trees in Palm Bay?
The city says a permit is required for removing trees on commercial and residential parcels over one acre. On single-family lots under an acre, the city's tree protection summary says an approved building permit is required before clearing.