The Florida Homeowners' Construction Recovery Fund is a state account that can repay part of what you lost when a licensed contractor abandoned your job, mishandled your money or signed false statements. It is created by s. 489.140 and administered by the Construction Industry Licensing Board. DBPR describes it as "a last resort after all civil remedies have been exhausted" (DBPR Recovery Fund page).
Who can claim
A claimant must be a homeowner, meaning the owner of an owner-occupied residence (s. 489.1402(1)(c) and (f)). A "residence" is a single-family home, an individual condominium or cooperative unit, or a building with no more than two units where the owner lives, or will live, at least six months of each year after the work is done (s. 489.1402(1)(i)).
The contractor must be a Division I or Division II contractor licensed under Part I of Chapter 489 when the violation happened (s. 489.1402(1)(d) and (g)). Electrical contractors are licensed under Part II and aren't in that definition.
Who is excluded
Under s. 489.141(2), you can't claim if:
- You are the contractor's spouse, or the spouse's personal representative
- You were the licensed contractor on the job
- The contract was for property the licensee owned or controlled
- The contractor didn't hold a valid and current license when you signed
- You had another business relationship with the licensee
- You hired a Division II contractor (for example, a roofer or plumber) before July 1, 2016
That fourth point is the one to remember when you hire. Paying an unlicensed contractor puts you outside the fund entirely. Check every license in DBPR's verification search before you sign.
What has to have gone wrong
The judgment, award or restitution order must be based on a violation of s. 489.129(1)(g), (j) or (k), or s. 713.35 (s. 489.141(1)(b)). In plain terms, under s. 489.129(1):
- (g) Financial mismanagement or misconduct causing you financial harm, which includes: valid liens recorded for supplies or services the contractor ordered and was paid for, not removed within 75 days; abandoning the job when the percentage complete is less than the percentage paid, without refunding the excess within 30 days; or finishing the job but leaving you paying more than the contract price plus change orders, for reasons within the contractor's control.
- (j) Abandonment. A project may be presumed abandoned after 90 days if the contractor terminates without just cause or proper notice, or doesn't work for 90 consecutive days without just cause.
- (k) False statements, such as falsely signing that work is bonded, that all subcontracted work and materials have been paid for, or that workers' compensation and liability insurance are in place.
Poor workmanship alone doesn't appear on that list.
Steps before you file
- Get the order. Obtain a final judgment, an arbitration award, or a CILB final order of restitution that names the violation and specifies your actual damages (s. 489.141(1)(a), (b) and (d)). The CILB says that since July 1, 2024, a local disciplinary order with restitution against a registered contractor, once adopted by the CILB, also qualifies (CILB FAQs).
- Try to collect. Exhaust any bond, insurance or warranty, and have a writ of execution issued and returned unsatisfied, or show you made all reasonable searches for the contractor's assets (s. 489.141(1) and (1)(e)). DBPR provides asset-search instructions (PDF). The CILB FAQ says a contractor's bankruptcy does not excuse the search.
- File within one year after the civil, criminal or administrative action or arbitration award concludes (s. 489.141(1)(f)).
- Use the claim form from the DBPR Recovery Fund page or call the Recovery Fund office at 850-921-6593.
The CILB FAQ notes you'll get a letter at least 14 days before your claim is heard, and you're encouraged to attend.
How much it pays
| Contract date | Division I per claim | Division II per claim | Lifetime cap per licensee |
|---|---|---|---|
| On or after July 1, 2024 | $100,000 | $30,000 | $2 million (Div. I) / $600,000 (Div. II) |
| Div. I after July 1, 2004; Div. II on or after July 1, 2016 | $50,000 | $15,000 | $500,000 (Div. I) / $150,000 (Div. II) |
Source: s. 489.143(3) and (6).
The fund pays the lesser of your judgment or order, the cap, or your actual damages. It does not pay post-judgment interest, attorney fees, court costs, medical damages or punitive damages (s. 489.143(2)). All claims arising from the same transaction share one cap, however many claimants there are (s. 489.143(5)). The CILB FAQ explains that actual damages are usually the verified cost to complete the original contract and pay off liens, minus the original contract price; where no work was done, it's the deposit.
Claims are paid in the order filed, up to the money the Legislature appropriates; if the year's appropriation runs out, pending claims carry to the next fiscal year (s. 489.143(7)-(8)).
What happens to the contractor
When the fund pays a claim, the contractor's license is automatically suspended and can't be reinstated until the contractor repays the fund in full with interest. Bankruptcy doesn't change that (s. 489.143(9)). Knowingly presenting a false claim is a third-degree felony (s. 489.143(10)).
Related pages
- Filing a complaint with DBPR
- Required contract notices, including the recovery fund statement
- Disputes and consumer protection topics
- Questions? Contact us
Sources
- s. 489.140, F.S.: fund created
- s. 489.1402, F.S.: definitions
- s. 489.141, F.S.: conditions and eligibility
- s. 489.143, F.S.: payment limits (amended by ch. 2024-178, Laws of Fla.)
- s. 489.129, F.S.: disciplinary grounds
- DBPR Recovery Fund page and CILB FAQs, Recovery Fund section
Frequently Asked Questions
How much can I get from the Florida Homeowners' Construction Recovery Fund?
For Division I and Division II contracts entered into on or after July 1, 2024, the maximum is $100,000 per Division I claim (general, building and residential contractors) and $30,000 per Division II claim (trade contractors such as roofing or plumbing). Payment is limited to actual damages and the unpaid amount of your judgment or order (s. 489.143(2)-(3), F.S.).
Does the recovery fund cover unlicensed contractors?
No. A claim is barred if it is based on a contract in which the contractor did not hold a valid and current license at the time of the contract (s. 489.141(2)(d), F.S.). For this rule, an active, inactive, delinquent or suspended license counts as valid and current (s. 489.1402(1)(l)).
Do I need a judgment before applying to the recovery fund?
Generally yes. You need a final judgment from a Florida court, an arbitration award, or a CILB final order directing the licensee to pay you restitution, based on a violation of s. 489.129(1)(g), (j) or (k) or s. 713.35, F.S. The board may waive this if the contractor died or a bankruptcy court prevented you from getting a judgment (s. 489.141(1)(a)).
How long do I have to file a recovery fund claim?
Within one year after the conclusion of any civil, criminal or administrative action or arbitration award based on the act (s. 489.141(1)(f), F.S.).